Release 3.4.0

Offline boarding passes, tide-aware cancellations, and the capacity fix from the 07:40, ready for the winter timetable. One required gate failed and two gates are pending. Ship or hold, then waive or rerun what did not pass.

2291 build
5 October target
1 failed
2 pending
4 passed
1 skipped
3 sections, 8 gates
01

What ships

3.4.0 carries what the winter timetable needs before it starts on 26 October. It reaches riders in stages: a tenth of app users on the first day, then everyone after three days without a rollback trigger.

ChangeWhat riders seeRollout
Offline boarding passesPasses scan at the Brisk slipway with no signal.Brisk only, behind a flag
Tide-aware cancellationsA Brisk sailing too shallow for the ramp cancels early, with a notice.The office approves each one for a month
Capacity check on held placesNothing, unless a deck is full, when a second sale is refused.Everyone
Winter timetableFewer Gannet crossings and a later first boat to Keddle.Everyone
Offline scan time on the oldest handheld, by build (ms)
02505007501,0001,2501,5002270: 1,4501,45022702276: 1,1201,12022762283: 84084022832288: 61061022882291: 5405402291
02

Gates

At a glance8 gates
#GateStatusRequiredVerdict
1Android end-to-end suitefailedYes
2App Store reviewpendingYes
3Harbour office walkthrough of tide cancellationspending
4Unit and integration testspassedYesNo verdict needed
5Load test at storm-day volumepassedYesNo verdict needed
6Accessibility pass on booking and passespassedYesNo verdict needed
7Crash-free beta sessions above 99.5%passedYesNo verdict needed
8Wallet pass validationskippedNo verdict needed
1

Android end-to-end suite

212 of 214 scenarios passed, and both failures are offline scans on Android 10 handhelds.

failedRequired
How checked

CI job e2e-android on build 2291, across the four handheld models the crews carry.

Result

212 of 214 passed. On Android 10, a scan made within 30 seconds of losing signal waits 4 seconds for the network before it checks offline.

Evidence

Job 18834, scenarios offline-scan-signal-drop and offline-scan-airplane-mode, with screen recordings attached.

Risk

Two of the Gannet’s six handhelds run Android 10. Some scans at the Brisk ramp would take four seconds, and a queue of cars would notice.

2

App Store review

Build 2291 went in for review on 29 September, and reviews have taken one to two days.

pendingRequired
How checked

The build’s status in App Store Connect.

Result

Waiting for review since 29 September at 16:20.

Note

Android does not wait on this, but staging one platform ahead of the other confuses the harbour office.

3

Harbour office walkthrough of tide cancellations

The office has to agree to approve each automatic cancellation for the first month.

pending
How checked

A walkthrough on the staging site with the harbour office, run by Ines.

Result

Booked for 2 October.

4

Unit and integration tests

1,904 tests passed on build 2291.

passedRequired
How checked

CI job test on build 2291.

Result

1,904 passed and none failed. Twelve are skipped because they cover the retired summer Petrel timetable.

5

Load test at storm-day volume

Six times normal traffic held booking at 420 ms p95, against an 800 ms target.

passedRequired
How checked

k6 run load/storm-day.js against staging for 30 minutes, at six times a normal winter Tuesday.

Result

420 ms at p95 and 910 ms at p99, with no errors. The target is 800 ms at p95.

6

Accessibility pass on booking and passes

Screen reader and keyboard checks passed on every changed screen, the new pass screen included.

passedRequired
How checked

VoiceOver and TalkBack walkthroughs by Mira, and axe in CI.

Result

Nothing blocking. The pass screen now reads out the sailing and party before the code.

7

Crash-free beta sessions above 99.5%

The beta ran 99.62% crash-free over seven days and 1,840 sessions.

passedRequired
How checked

Crash reports from the 3.4.0 beta group, 22 to 29 September.

Result

99.62% of 1,840 sessions were crash-free, above the 99.5% gate.

8

Wallet pass validation

Not run, because wallet passes are out of scope for 3.4.0.

skipped
How checked

Not run.

Result

Skipped by the offline boarding passes plan. Wallet passes wait for a later release.

03

Rollback

Roll back when crash-free sessions fall below 99% for an hour, or when more than 2 in 100 scans at any harbour fall back to the paper list. Joss or Tomas can do it alone, day or night.

Rollback steps
# Stop the staged rollout where it is
release halt 3.4.0

# Turn offline passes off at Brisk; scanners go back to online checks
flags set offline-passes --harbour brisk --off

# Return the booking service to 3.3.2
deploy booking --version 3.3.2 --reason "rollback 3.4.0"

Your reply

Your choices, ready to send. Copy this reply back to your agent when you’re done.

Example ship, waive 3. Notes: 3: known arm64 flake.

Choice: Ship. Waive: gate 3. Note on gate 3: known arm64 flake.

nothing.

Nothing decided yet.